CITIZEN'S CHARTER |
office of the CITY ENGINEER (oce)
1. Issuance of Building Permit/Accessory Permit and Ancillary Permit
For person, firm or corporation, including any agency or insrumentality of the government who shall erect, construct, alter, move, convert, or demolish any building or structure.
Office or Division: | Office of the City Engineer | |||
---|---|---|---|---|
Classification: | Simple/Complex | |||
Type of Transaction: | G2C |
|||
Who may avail: | Any person, firm or corporation including any agency or instrumentality of the government desiring to obtain building permit | |||
CHECKLIST OF REQUIREMENTS | WHERE TO SECURE | |||
Application forms, 5 copy each | Office of the City Engineer | |||
Lot survey plan signed and sealed by Geodetic Engineer, 5 copy each | Geodetic Engineer | |||
Architectural plan/s signed and sealed by Architect, 5 copy each | Architect | |||
Civil and Structural plan/s signed and sealed by Civil Engineer for single (1) and two (2) storey building and Structural Engineer for three (3) storey and above, 5 copy each | Civil or Structural Engineer | |||
Electrical plan/s signed and sealed by Professional Electrical Engineer, 5 copy each | Professional Electrical Engineer | |||
Mechanical plan/s signed and sealed by Professional Mechanical Engineer, 5 copy each | Professional Mechanical Engineer | |||
Sanitary plan/s signed and sealed by Sanitary Engineer, 5 copy each | Sanitary Engineer | |||
Plumbing plan/s signed and sealed by Sanitary Engineer, 5 copy each | Master Plumber | |||
Electronic plan/s signed and sealed by Electronics Engineer, 5 copy each | Electronics Engineer | |||
Certified true copy of OCT/TCT, if the applicant is not the registered lot owner notarized Contract of Lease, or Deed of Absolute Sale, 5 copy each | Office of the City Assessor | |||
Current Real Property Tax Receipt, 5 copy each | Office of the City Treasurer | |||
Bill of Materials/Cost Estimates signed and sealed by professionals, 5 copy each | Architect, Civil/Structural Engineer, Professional Electrical Engneer, Professional Mechanical Engineer, Sanitary Engineer, Master Plumber, Electronics Engineer |
|||
Structural Design Analysis signed and sealed by Civil Engineer for two (2) storey and below and Structural Engineer for three (3) storey and above, 5 copy each | Civil or Structural Engineer | |||
Locational Clearance obtained from City Planning and Development Office, 1 original and 4 photocopy | Office of the City Planning and Development Officer | |||
Fire Safety Evaluation Clearance, FSEC obtained from BFP, 1 original and 4 photocopy | Bureau of Fire Protection | |||
Barangay Clearance for Construction, 1 original and 1 photocopy | Barangay Hall | |||
Other clearances whenever necessary, 1 original and 4 photocopy - Road right of way clearance for National Road & Provincial Road. - Clearance on Easement (all bodies of water) - CAAP Clearance for Cell Site Tower - Pool Water discharge plan/Affidavit of Undertaking (for swimming pool) - For Demolition Permit submit letter of no objection in case that there is/are occupants upon site inspection before issuance of permit - Historical Clearance (along Central School – City Proper – Paseo Del Congreso | Other government agency - Department of Public Works and Highways (DPWH) - Department of Public Works and Highways (DPWH) & National Irrigation Administration (NIA) - Civil Aviation Authority of the Philippines (CAAP) - Mechanical Engineer/master Plumber - Lot/Building Owner - Arts, Culture, Tourism, Youth and Sports Division |
|||
CLIENT STEPS | AGENCY ACTIONS | FEES TO BE PAID | PROCESSING TIME | PERSON RESPONSIBLE |
1. Submit all the requirements except FSEC from BFP | 1.1 Receive application and requirements 1.2 Evaluate Architectural, Civil, Electrical, Mechanical, Sanitary /Plumbing 1.3 Conduct site inspection 1.4 Assess fees | None None None As per NBCP PD 1096 | 15 mins 2 hours 1- 3 days (Simple) 5 days (Complex) 14 days (Highly Technical) 5 mins | Ryan Pascual Arnel Tenorio Rommel Javier Renier Marc Santiago Jerome Dequilla Engr. Arnold Punongbayan Ryan Pascual |
2. Bring 3 sets of Plans, 1 set of Bill of Materials/Cost Estimate and endorsement letter to BFP. | 2. Return 3 sets of Plans, 1 set of Bill of Materials/Cost Estimate and issue endorsement letter for BFP | As per BFP | 5 mins | |
3. Receive Order of Payment. | 3. Release Order of Payment. | None | 2 mins | Ryan Pascual |
4. Submit FSEC Form | 4. Receive FSEC. | None | 2 mins | Ryan Pascual |
5.Pay Order of Payment at City Treasurer’s Office | 5. City Treasurer’s Office | None | ||
6. Submit photocopy of OR. | 6.Receive photocopy of OR | None | 2 mins | Ryan Pascual |
7. Wait for the schedule of the releasing of the Building Permit. | 7.1 Prepare all submitted forms and plans for signature, stamp control | None | 1 hour | Ryan Pascual Arnel Tenorio |
7.2 Signed by signatories | 10 mins | Engr. Arnold Punongbayan (Electrical Permit) Engr. Paul Peter Papa (Recommeding Approval) Engr. Ricasol Millan (Building Official) |
||
8. Claim Building Permit | 8.Release Building Permit | None | 2 mins | Ryan Pascual Arnel Tenorio |
2. Issuance of Certificate of Occupancy
For person, firm or corporation, including any agency or instrumentality of the government who would like to occupy or use the building or structure
Office or Division: | Office of the City Engineer | |||
---|---|---|---|---|
Classification: | Simple/Complex | |||
Type of Transaction: | G2C |
|||
Who may avail: | Any person, firm or corporation including any agency or instrumentality of the government desiring to obtain building permit |
|||
CHECKLIST OF REQUIREMENTS | WHERE TO SECURE | |||
Architectural, Civil/Structural, Electrical, Mechanical, Sanitary Plumbing, Electronics completion form, one copy | Office of the City Engineer | |||
As built plans, one copy | Architect, Civil/Structural Engineer, Professional Electrical Engneer, Professional Mechanical Engineer, Sanitary Engineer, Master Plumber, Electronics Engineer |
|||
Specifications, one copy | Architect, Civil/Structural Engineer, Professional Electrical Engneer, Professional Mechanical Engineer, Sanitary Engineer, Master Plumber, Electronics Engineer |
|||
Picture of the Building/Structure showing front, right, left and rear side, one copy | By applicant |
|||
Barangay Clearance for Occupancy, one copy | Barangay Hall | |||
Fire safety inspection certificate FSIC, one copy | Bureau of Fire Protection | |||
Other clearances whenever necessary, one copy - Road right of way clearance for National Road & Provincial Road. - Clearance on Easement (all bodies of water) - CAAP Clearance for Cell Site Tower - Garbage Disposal | Other government agency - Department of Public Works and Highways (DPWH) - Department of Public Works and Highways (DPWH) & National Irrigation Administration (NIA) - Civil Aviation Authority of the Philippines (CAAP) - Environment and Natural Resources Division |
|||
CLIENT STEPS | AGENCY ACTIONS | FEES TO BE PAID | PROCESSING TIME | PERSON RESPONSIBLE |
1. Submit all the requirements except for FSIC from BFP | 1.1 Receive requirements 1.2 Evaluate Architectural, Civil, Electrical, Mechanical, Sanitary /Plumbing 1.3 Conduct site inspection 1.4 Assess fees | None None None As per NBCP PD 1096 | 15 mins 2 hours 1-4 Days (simple) 5 Days (complex) 14 Days (Highly Technical) 5 mins | Ryan Pascual Arnel Tenorio Rommel Javier Renier Marc Santiago Jerome Dequilla Engr. Arnold Punongbayan Ryan Pascual |
2. Bring endorsement letter to BFP. | 2. Issue endorsement letter for BFP. | As per BFP | 5 mins | |
3. Receive Order of Payment. | 3. Release Order of Payment. | None | 2 mins | Ryan Pascual |
4. Submit FSIC. | 4. Receive FSIC. | None | 2 mins | Ryan Pascual Arnel Tenorio |
5.Pay Order of Payment at Office of the City Treasurer. | 5. City Treasurer’s Office | None | ||
6. Submit Order of Payment. | 6.Receive Order of Payment. | None | 2 mins | Ryan Pascual |
7. Wait for the schedule of the releasing of the Certificate of Occupancy. | 7.1 Prepare certificate of occupancy. 7.2 Sign certificate by signatories. | None | 1 hour 10 mins | Ryan Pascual Arnel Tenorio Engr. Ricasol Millan |
8. Claim Certificate of Occupancy. | 8.Release Certificate of Occupancy. | None | 2 mins | Ryan Pascual |
3. Issuance of Certificate of Final Electrical Inspection – New Connection
For person, firm or corporation, including any agency or instrumentality of the government who would like to apply for new electrical connection from Meralco.
Office or Division: | Office of the City Engineer | |||
---|---|---|---|---|
Classification: | Simple/Complex |
|||
Type of Transaction: | G2C |
|||
Who may avail: | Any person, firm or corporation including any agency or instrumentality of the government desiring to obtain new connection from Meralco services. |
|||
CHECKLIST OF REQUIREMENTS | WHERE TO SECURE | |||
Yellow Card, one copy | Meralco |
|||
Copy of Certificate of Occupancy, one copy | By applicant/owner | |||
CLIENT STEPS | AGENCY ACTIONS | FEES TO BE PAID | PROCESSING TIME | PERSON RESPONSIBLE |
1. Submit all the requirements. | 1.1 Receive all the requirements 1.2 Assess fees. | None As per NBCP PD 1096 | 10 mins 5 mins | Honesto San Pedro |
2. Receive Order of Payment. | 2. Release Order of Payment. | None | 5 mins | Honesto San Pedro |
3. Pay Order of Payment at the Office of the City Treasurer | 3. By the Office of the City Treasurer | |||
4. Submit photocopy of Official Receipt. | 4. Receive copy of payment. | None | 2 mins | Honesto San Pedro |
5.Secure signature of approval. | 5. Sign permit by signatories. | None | 10 mins | Engr. Punongbayan Engr. Ricasol Millan (Building Official) |
6. Claim Certificate of Final Electrical Inspection. | 6. Release Certificate of Final Electrical Inspection. | None | 2 mins | Honesto San Pedro Romulo Angeles Jr. |
4. Issuance of Certificate of Final Electrical Inspection – New Connection without Certificate of Occupancy
For person, firm or corporation, including any agency or instrumentality of the government who would like to apply for new electrical connection from Meralco.
Office or Division: | Office of the City Engineer | |||
---|---|---|---|---|
Classification: | Simple/Complex |
|||
Type of Transaction: | G2C |
|||
Who may avail: | Any person, firm or corporation including any agency or instrumentality of the government desiring to obtain new connection from Meralco services. |
|||
CHECKLIST OF REQUIREMENTS | WHERE TO SECURE | |||
Yellow Card, one copy | Meralco |
|||
Sketch / Location Map, one copy | By applicant/owner | |||
Barangay Clearance for Electrical Application, one copy | Barangay where the structure/establishment/Electrical facility is located | |||
Land Title, one copy | Office of the City Assessor | |||
Current Tax Receipt, one copy | Office of the City Treasurer | |||
House Picture | Owner | |||
Electrical Layout | Master Electrician/Electrical Engineer/Professional Electrical Engineer | |||
Other permit/clearances applicable to the application, one copy | Government agency involved in the application | |||
CLIENT STEPS | AGENCY ACTIONS | FEES TO BE PAID | PROCESSING TIME | PERSON RESPONSIBLE |
1. Submit all the requirements. | 1.1 Receive all the requirements 1.2 Conduct site inspection 1.3 Assess fees | None None As per NBCPPD 1096 | 10 mins 1 day 5 mins | Honesto San Pedro Joey Dela Cruz Ronnie Manlapaz Honesto San Pedro |
2. Receive Order of Payment. | 2. Release Order of Payment. | None | 5 mins | Honesto San Pedro |
3. Pay Order of Payment at the Office of the City Treasurer | 3. By the Office of the City Treasurer | Office of the City Treasurer | ||
4. Submit photocopy of Official Receipt. | 4. Receive copy of payment. | None | 2 mins | Honesto San Pedro |
5.Secure signature of approval. | 5. Sign permit by signatories. | None | 10 mins | Engr. Arnold Punongbayan Engr. Ricasol Millan (Building Official) |
6. Claim Certificate of Final Electrical Inspection. | 6. Release Certificate of Final Electrical Inspection. | None | 2 mins | Honesto San Pedro Romulo Angeles Jr. |
5. Issuance of Certificate of Final Inspection – Reconnection of Service
For person, firm or corporation, including any agency or instrumentality of the government who would like to apply for reconnection of electrical service from Meralco.
Office or Division: | Office of the City Engineer | |||
---|---|---|---|---|
Classification: | Simple/Complex |
|||
Type of Transaction: | G2C |
|||
Who may avail: | Any person, firm or corporation including any agency or instrumentality of the government desiring to reconnect to Meralco services |
|||
CHECKLIST OF REQUIREMENTS | WHERE TO SECURE | |||
Yellow Card, one copy | Meralco |
|||
Old Meralco Bill, one copy | By applicant/owner | |||
Current Real Property Tax Receipt, one copy | Office of the City Assessor | |||
Barangay Clearance for Meralco service, one copy | Barangay Hall | |||
CLIENT STEPS | AGENCY ACTIONS | FEES TO BE PAID | PROCESSING TIME | PERSON RESPONSIBLE |
1. Submit all the requirements | 1.1 Receive all the requirements 1.2 Conduct site inspection 1.3 Assess fees | None None As per NBCP PD 1096 | 10 mins 1 day 5 mins | Honesto San Pedro Ronnie Manlapaz Joey Dela Cruz Honesto San Pedro |
2. Receive Order of Payment. | 2. Release Order of Payment. | None | 5 mins | Honesto San Pedro |
3. Pay Order of Payment at the Office of the City Treasurer. | 3. By the Office of the City Treasurer | |||
4. Submit photocopy of Official Receipt. | 4. Receive copy of payment. | None | 2 mins | Honesto San Pedro |
5.Secure signature of approval. | 5. Sign permit by signatories. | None | 10 mins | Engr.Arnold Punongbayan Engr. Ricasol Millan (Building Official) |
6. Claim Certificate of Final Electrical Inspection. | 6. Release Certificate of Final Electrical Inspection. | None | 2 mins | Honesto San Pedro Romulo Angeles Jr |
6. Issuance of Temporary Electrical Permit
For person, firm or corporation, including any agency or instrumentality of the government who would like to apply for temporary electrical service from Meralco.
Office or Division: | Office of the City Engineer | |||
---|---|---|---|---|
Classification: | Simple/Complex |
|||
Type of Transaction: | G2C |
|||
Who may avail: | Any person, firm or corporation including any agency or instrumentality of the government desiring to obtain occupancy permit |
|||
CHECKLIST OF REQUIREMENTS | WHERE TO SECURE | |||
Temporary Electrical Permit form, two copy | Office of the City Engineer | |||
Building Permit / Ancillary Permit / Accessory Permit, one copy | Office of the City Engineer | |||
Yellow Card, one copy | Meralco | |||
CLIENT STEPS | AGENCY ACTIONS | FEES TO BE PAID | PROCESSING TIME | PERSON RESPONSIBLE |
1. Submit all the requirements. | 1.1 Receive all the requirements 1.2 Assess fees | None As per NBCP PD 1096 | 10 mins 5 mins | Honesto San Pedro |
2. Receive Order of Payment. | 2. Release Order of Payment. | None | 5 mins | Honesto San Pedro |
3. Pay Order of Payment at the Office of the City Treasurer. | 3. By the Office of the City Treasurer | None | 2 mins | Honesto San Pedro |
4. Submit photocopy of Official Receipt. | 4. Receive copy of payment. | None | 2 mins | Honesto San Pedro |
5.Secure signature of approval (2 signatories) | 5. Sign permit by signatories. | None | 10 mins | Engr. Arnold Punongbayan Engr. Ricasol Millan (Building Official) |
6. Claim Temporary Electrical Permit. | 6. Release Temporary Electrical Permit. | None | 2 mins | Honesto San Pedro Romulo Angeles Jr. |
7. ISSUANCE OF CLEARANCE FOR NEW AND RENEWAL OF BUSINESS PERMIT APPLICATION
Office or Division: | Office of the City Engineer | |||
---|---|---|---|---|
Classification: | Simple/Complex |
|||
Type of Transaction: | G2C |
|||
Who may avail: | All Business Taxpayers in Malolos | |||
CHECKLIST OF REQUIREMENTS | WHERE TO SECURE | |||
Occupancy Permit | Office of the City Engineer | |||
Duly Accomplished Application | Business Permit and Licensing Division | |||
Fee(s)/Charge(s): - Refer to the Annual Inspection Fee at National Building Code (P.D. 1096) | ||||
CLIENT STEPS | AGENCY ACTIONS | PROCESSING TIME | PERSON RESPONSIBLE |
|
1. Submit the application form by BPLO through the system | Verify/Evaluate the application | 10 mins | Brianel Faustino Ramon Marcelo Jr. Jhimnor Aguilar |
|
2. Receive the approved application with the assessed fees through the system | Assess the fees. | 5 mins | Brianel Faustino Ramon Marcelo Jr. Jhimnor Aguilar |
|
Fill – out the client satisfaction rating form. | ||||
Total Duration of Activity | 15 mins |