office of the CITY ENGINEER (oce)

1. Issuance of Building Permit/Accessory Permit and Ancillary Permit

For person, firm or corporation, including any agency or insrumentality of the government who shall erect, construct, alter, move, convert, or demolish any building or structure.

Office or Division:Office of the City Engineer
Classification: Simple/Complex
Type of Transaction:G2C
Who may avail:Any person, firm or corporation including any agency or
instrumentality of the government desiring to obtain building
permit
CHECKLIST OF REQUIREMENTSWHERE TO SECURE
Application forms, 5 copy each Office of the City Engineer
Lot survey plan signed and sealed by
Geodetic Engineer, 5 copy each
Geodetic Engineer
Architectural plan/s signed and sealed
by Architect, 5 copy each
Architect
Civil and Structural plan/s signed and
sealed by Civil Engineer for single (1)
and two (2) storey building and
Structural Engineer for three (3) storey
and above, 5 copy each
Civil or Structural Engineer
Electrical plan/s signed and sealed by
Professional Electrical Engineer, 5 copy
each
Professional Electrical Engineer
Mechanical plan/s signed and sealed by
Professional Mechanical Engineer, 5
copy each
Professional Mechanical Engineer
Sanitary plan/s signed and sealed by
Sanitary Engineer, 5 copy each
Sanitary Engineer
Plumbing plan/s signed and sealed by
Sanitary Engineer, 5 copy each
Master Plumber
Electronic plan/s signed and sealed by
Electronics Engineer, 5 copy each
Electronics Engineer
Certified true copy of OCT/TCT, if the
applicant is not the registered lot owner
notarized Contract of Lease, or Deed of
Absolute Sale, 5 copy each
Office of the City Assessor
Current Real Property Tax Receipt, 5
copy each
Office of the City Treasurer
Bill of Materials/Cost Estimates signed
and sealed by professionals, 5 copy each
Architect, Civil/Structural Engineer,
Professional Electrical Engneer, Professional Mechanical Engineer, Sanitary
Engineer, Master Plumber, Electronics
Engineer
Structural Design Analysis signed and
sealed by Civil Engineer for two (2)
storey and below and Structural
Engineer for three (3) storey and above,
5 copy each
Civil or Structural Engineer
Locational Clearance obtained from City
Planning and Development Office, 1
original and 4 photocopy
Office of the City Planning and Development Officer
Fire Safety Evaluation Clearance, FSEC
obtained from BFP, 1 original and 4
photocopy
Bureau of Fire Protection
Barangay Clearance for Construction, 1
original and 1 photocopy
Barangay Hall
Other clearances whenever necessary,
1 original and 4 photocopy

- Road right of way clearance for National Road & Provincial Road.

- Clearance on Easement (all bodies of water)

- CAAP Clearance for Cell Site Tower

- Pool Water discharge plan/Affidavit of Undertaking (for swimming pool)

- For Demolition Permit submit letter of no objection in case that there is/are occupants upon site inspection before issuance of permit

- Historical Clearance (along Central School – City Proper – Paseo Del Congreso

Other government agency

- Department of Public Works and Highways (DPWH)

- Department of Public Works and Highways (DPWH) & National Irrigation Administration (NIA)

- Civil Aviation Authority of the Philippines (CAAP)

- Mechanical Engineer/master Plumber

- Lot/Building Owner

- Arts, Culture, Tourism, Youth and Sports Division
CLIENT
STEPS
AGENCY
ACTIONS
FEES TO
BE PAID
PROCESSING
TIME
PERSON
RESPONSIBLE
1. Submit all
the
requirements
except FSEC
from BFP
1.1 Receive
application and
requirements
1.2 Evaluate
Architectural,
Civil, Electrical,
Mechanical,
Sanitary
/Plumbing
1.3 Conduct site
inspection
1.4 Assess fees
None


None





None

As per
NBCP PD
1096
15 mins


2 hours
1- 3 days (Simple)
5 days (Complex)
14 days (Highly Technical)
5 mins
Ryan Pascual
Arnel Tenorio

Rommel Javier
Renier Marc Santiago
Jerome Dequilla


Engr. Arnold
Punongbayan


Ryan Pascual
2. Bring 3 sets
of Plans, 1 set
of Bill of
Materials/Cost
Estimate and
endorsement
letter to BFP.
2. Return 3 sets
of Plans, 1 set of
Bill of
Materials/Cost
Estimate and
issue
endorsement letter for BFP
As per BFP5 mins
3. Receive
Order of
Payment.
3. Release Order
of Payment.
None2 mins Ryan Pascual
4. Submit
FSEC Form
4. Receive
FSEC.
None2 mins Ryan Pascual
5.Pay Order of
Payment at
City
Treasurer’s
Office
5. City
Treasurer’s
Office
None
6. Submit
photocopy
of OR.
6.Receive
photocopy of OR
None2 minsRyan Pascual
7. Wait for the
schedule of
the
releasing of
the Building
Permit.
7.1 Prepare all
submitted forms
and plans for
signature, stamp
control
None1 hour

Ryan Pascual
Arnel Tenorio

7.2 Signed by
signatories
10 minsEngr. Arnold
Punongbayan
(Electrical Permit)
Engr. Paul Peter Papa
(Recommeding Approval)
Engr. Ricasol Millan
(Building Official)
8. Claim
Building
Permit
8.Release
Building Permit
None2 minsRyan Pascual
Arnel Tenorio

2. Issuance of Certificate of Occupancy

For person, firm or corporation, including any agency or instrumentality of the government who would like to occupy or use the building or structure

Office or Division:Office of the City Engineer
Classification: Simple/Complex
Type of Transaction:G2C
Who may avail:Any person, firm or corporation including any agency or
instrumentality of the government desiring to obtain building
permit
CHECKLIST OF REQUIREMENTSWHERE TO SECURE
Architectural, Civil/Structural, Electrical,
Mechanical, Sanitary Plumbing,
Electronics completion form, one copy
Office of the City Engineer
As built plans, one copyArchitect, Civil/Structural Engineer,
Professional Electrical Engneer,
Professional Mechanical Engineer, Sanitary
Engineer, Master Plumber, Electronics
Engineer
Specifications, one copyArchitect, Civil/Structural Engineer,
Professional Electrical Engneer,
Professional Mechanical Engineer, Sanitary
Engineer, Master Plumber, Electronics
Engineer
Picture of the Building/Structure showing
front, right, left and rear side, one copy
By applicant
Barangay Clearance for Occupancy,
one copy
Barangay Hall
Fire safety inspection certificate FSIC,
one copy
Bureau of Fire Protection
Other clearances whenever necessary,
one copy

- Road right of way clearance for National Road & Provincial Road.

- Clearance on Easement (all bodies of water)

- CAAP Clearance for Cell Site Tower

- Garbage Disposal
Other government agency

- Department of Public Works and Highways (DPWH)

- Department of Public Works and Highways (DPWH) & National Irrigation Administration (NIA)

- Civil Aviation Authority of the Philippines (CAAP)

- Environment and Natural Resources Division
CLIENT
STEPS
AGENCY
ACTIONS
FEES TO
BE PAID
PROCESSING
TIME
PERSON
RESPONSIBLE
1. Submit all
the
requirements
except for
FSIC from BFP
1.1 Receive
requirements
1.2 Evaluate
Architectural,
Civil, Electrical,
Mechanical,
Sanitary
/Plumbing
1.3 Conduct site
inspection
1.4 Assess fees
None
None
None
As per
NBCP PD
1096
15 mins

2 hours

1-4 Days (simple)
5 Days (complex)
14 Days (Highly Technical)

5 mins
Ryan Pascual
Arnel Tenorio

Rommel Javier
Renier Marc Santiago
Jerome Dequilla

Engr. Arnold
Punongbayan

Ryan Pascual
2. Bring
endorsement
letter to BFP.
2. Issue
endorsement
letter for BFP.
As per BFP5 mins
3. Receive
Order of
Payment.
3. Release Order
of Payment.
None2 minsRyan Pascual
4. Submit
FSIC.
4. Receive FSIC. None2 minsRyan Pascual
Arnel Tenorio
5.Pay Order of Payment at Office of the City Treasurer.5. City
Treasurer’s
Office
None
6. Submit
Order of
Payment.
6.Receive Order
of Payment.
None2 minsRyan Pascual
7. Wait for the
schedule of the
releasing of the
Certificate of
Occupancy.
7.1 Prepare
certificate of
occupancy.
7.2 Sign
certificate by
signatories.
None1 hour

10 mins
Ryan Pascual
Arnel Tenorio

Engr. Ricasol
Millan
8. Claim
Certificate of
Occupancy.
8.Release
Certificate of
Occupancy.
None2 minsRyan Pascual

3. Issuance of Certificate of Final Electrical Inspection – New Connection

For person, firm or corporation, including any agency or instrumentality of the government who would like to apply for new electrical connection from Meralco.

Office or Division:Office of the City Engineer
Classification: Simple/Complex
Type of Transaction:G2C
Who may avail:Any person, firm or corporation including any agency or
instrumentality of the government desiring to obtain new
connection from Meralco services.
CHECKLIST OF REQUIREMENTSWHERE TO SECURE
Yellow Card, one copyMeralco
Copy of Certificate of Occupancy, one
copy
By applicant/owner
CLIENT
STEPS
AGENCY
ACTIONS
FEES TO
BE PAID
PROCESSING
TIME
PERSON
RESPONSIBLE
1. Submit all
the
requirements.
1.1 Receive all
the requirements
1.2 Assess fees.
None

As per
NBCP PD
1096
10 mins

5 mins
Honesto San Pedro
2. Receive
Order of
Payment.
2. Release Order
of Payment.
None5 minsHonesto San Pedro
3. Pay Order of Payment at the Office of the City Treasurer3. By the Office of the City Treasurer
4. Submit
photocopy of
Official
Receipt.
4. Receive copy
of payment.
None2 minsHonesto San Pedro
5.Secure
signature of
approval.
5. Sign permit by
signatories.
None10 minsEngr. Punongbayan

Engr. Ricasol Millan
(Building Official)
6. Claim
Certificate of
Final Electrical
Inspection.
6. Release
Certificate of
Final Electrical
Inspection.
None2 minsHonesto San Pedro

Romulo Angeles Jr.

4. Issuance of Certificate of Final Electrical Inspection – New Connection without Certificate of Occupancy

For person, firm or corporation, including any agency or instrumentality of the government who would like to apply for new electrical connection from Meralco.

Office or Division:Office of the City Engineer
Classification: Simple/Complex
Type of Transaction:G2C
Who may avail:Any person, firm or corporation including any agency or
instrumentality of the government desiring to obtain new
connection from Meralco services.
CHECKLIST OF REQUIREMENTSWHERE TO SECURE
Yellow Card, one copyMeralco
Sketch / Location Map, one copyBy applicant/owner
Barangay Clearance for Electrical
Application, one copy
Barangay where the structure/establishment/Electrical facility is located
Land Title, one copy Office of the City Assessor
Current Tax Receipt, one copyOffice of the City Treasurer
House PictureOwner
Electrical LayoutMaster Electrician/Electrical Engineer/Professional Electrical Engineer
Other permit/clearances applicable to
the application, one copy
Government agency involved in the
application
CLIENT
STEPS
AGENCY
ACTIONS
FEES TO
BE PAID
PROCESSING
TIME
PERSON
RESPONSIBLE
1. Submit all
the
requirements.
1.1 Receive all
the requirements

1.2 Conduct site
inspection

1.3 Assess fees
None




None



As per NBCPPD 1096
10 mins




1 day



5 mins
Honesto San Pedro



Joey Dela Cruz
Ronnie Manlapaz

Honesto San Pedro
2. Receive
Order of
Payment.
2. Release Order
of Payment.
None5 minsHonesto San Pedro
3. Pay Order of Payment at the Office of the City Treasurer3. By the Office of the City TreasurerOffice of the City Treasurer
4. Submit
photocopy of
Official
Receipt.
4. Receive copy
of payment.
None2 minsHonesto San Pedro
5.Secure
signature of
approval.
5. Sign permit by
signatories.
None10 minsEngr. Arnold
Punongbayan

Engr. Ricasol
Millan
(Building Official)
6. Claim
Certificate of
Final Electrical
Inspection.
6. Release
Certificate of
Final Electrical
Inspection.
None2 minsHonesto San Pedro
Romulo Angeles Jr.

5. Issuance of Certificate of Final Inspection – Reconnection of Service

For person, firm or corporation, including any agency or instrumentality of the government who would like to apply for reconnection of electrical service from Meralco.

Office or Division:Office of the City Engineer
Classification: Simple/Complex
Type of Transaction:G2C
Who may avail:Any person, firm or corporation including any agency or
instrumentality of the government desiring to reconnect to
Meralco services
CHECKLIST OF REQUIREMENTSWHERE TO SECURE
Yellow Card, one copyMeralco
Old Meralco Bill, one copyBy applicant/owner
Current Real Property Tax Receipt, one
copy
Office of the City Assessor
Barangay Clearance for Meralco
service, one copy
Barangay Hall
CLIENT
STEPS
AGENCY
ACTIONS
FEES TO
BE PAID
PROCESSING
TIME
PERSON
RESPONSIBLE
1. Submit all
the
requirements
1.1 Receive all
the requirements
1.2 Conduct site
inspection
1.3 Assess fees
None



None


As per
NBCP PD 1096
10 mins



1 day


5 mins
Honesto San Pedro

Ronnie Manlapaz
Joey Dela Cruz


Honesto San Pedro
2. Receive
Order of
Payment.
2. Release Order
of Payment.
None5 minsHonesto San Pedro
3. Pay Order of Payment at the Office of the City Treasurer.3. By the Office of the City Treasurer
4. Submit
photocopy of
Official
Receipt.
4. Receive copy
of payment.
None2 minsHonesto San Pedro
5.Secure
signature of
approval.
5. Sign permit by
signatories.
None10 minsEngr.Arnold
Punongbayan

Engr. Ricasol Millan (Building Official)
6. Claim
Certificate of
Final Electrical
Inspection.
6. Release
Certificate of
Final Electrical
Inspection.
None2 mins Honesto San Pedro
Romulo Angeles Jr

6. Issuance of Temporary Electrical Permit

For person, firm or corporation, including any agency or instrumentality of the government who would like to apply for temporary electrical service from Meralco.

Office or Division:Office of the City Engineer
Classification: Simple/Complex
Type of Transaction:G2C
Who may avail:Any person, firm or corporation including any agency or
instrumentality of the government desiring to obtain occupancy
permit
CHECKLIST OF REQUIREMENTSWHERE TO SECURE
Temporary Electrical Permit form, two
copy
Office of the City Engineer
Building Permit / Ancillary Permit /
Accessory Permit, one copy
Office of the City Engineer
Yellow Card, one copyMeralco
CLIENT
STEPS
AGENCY
ACTIONS
FEES TO
BE PAID
PROCESSING
TIME
PERSON
RESPONSIBLE
1. Submit all
the
requirements.
1.1 Receive all
the requirements
1.2 Assess fees
None


As per
NBCP PD
1096
10 mins


5 mins
Honesto San Pedro
2. Receive
Order of
Payment.
2. Release Order
of Payment.
None5 mins Honesto San Pedro
3. Pay Order of
Payment at the Office of the City Treasurer.
3. By the Office of the City TreasurerNone2 minsHonesto San Pedro
4. Submit
photocopy of
Official
Receipt.
4. Receive copy
of payment.
None2 minsHonesto San Pedro
5.Secure
signature of
approval (2
signatories)
5. Sign permit by
signatories.
None10 minsEngr. Arnold
Punongbayan
Engr. Ricasol Millan (Building Official)
6. Claim
Temporary
Electrical
Permit.
6. Release
Temporary
Electrical Permit.
None2 mins Honesto San Pedro
Romulo Angeles Jr.

7. ISSUANCE OF CLEARANCE FOR NEW AND RENEWAL OF BUSINESS PERMIT APPLICATION

Office or Division:Office of the City Engineer
Classification:Simple/Complex
Type of Transaction:G2C
Who may avail:All Business Taxpayers in Malolos
CHECKLIST OF REQUIREMENTSWHERE TO SECURE
Occupancy PermitOffice of the City Engineer
Duly Accomplished ApplicationBusiness Permit and Licensing Division
Fee(s)/Charge(s):
- Refer to the Annual Inspection Fee at National Building Code (P.D. 1096)
CLIENT
STEPS
AGENCY
ACTIONS
PROCESSING
TIME
PERSON
RESPONSIBLE
1. Submit the application form by BPLO through the systemVerify/Evaluate the application10 minsBrianel Faustino Ramon Marcelo Jr.
Jhimnor Aguilar
2. Receive the approved application with the assessed fees through the systemAssess the fees.5 minsBrianel Faustino
Ramon Marcelo Jr.
Jhimnor Aguilar

Fill – out the client satisfaction rating form.
Total Duration of Activity15 mins